Previous page <> Next

Building the 'Sinbad 2' kit - continued:


26-08-02 26-08-03
The locating discs require a small chamfer (1 to 1.5mm). I am using a small angle grinder with soft disc, while rotating the disc with the drill. The other part of the lock is assembled and tested against the aft mid bulkhead.
12-08-01 26-08-05
Locating disc ready for dry fit, will be glued on at a later stage. Dagger board case glue up.
26-08-06.jpg 26-08-07
All external areas that will be glassed have a shallow recess routed The recess is tapered by sanding. Taper runs out at half the width of the glass tape.
26-08-08 26-08-09
All panels have been prepared and assembly can begin. The stocks are pretty basic using a welded steel framework and treated pine runners.
26-08-10 26-08-11
Mold spacing is marked off on the runners, a nylon line marks the centerline. The first mold is set up. All the remaining molds have been fitted. Note there are two mid bulkhead molds. This allows building of each half separately.

Previous page <> Next
Top of Page
Loading first page footer ... or Your browser does not support JavaScript
Loading second page footer ... or Your browser does not support JavaScript